GEOPHYSICAL STUDIES FOR THE DRILLING OF A BOREHOLE FOR Mr. AMUNGWA VICTOR AT NTA’AFI, BAMENDANKWE, BAMENDA I, NORTH WEST REGION, CAMEROON - Group Tesla Engineering | GTE

GEOPHYSICAL STUDIES FOR THE DRILLING OF A BOREHOLE FOR Mr. AMUNGWA VICTOR AT NTA’AFI, BAMENDANKWE, BAMENDA I, NORTH WEST REGION, CAMEROON

Interpretation

A rigorous synthesis of the multi-dimensional geophysical models strongly indicates the presence of a substantial structural anomaly at the exact coordinates of point F1. This highly conductive zone corresponds to a heavily fractured, water-bearing fracture network embedded within a stable Gneiss rock matrix. Consequently, point F1 represents the prime target location for physical borehole implantation.

Based on the depth-to-bedrock curves and fracture zone modeling, the optimal target drilling depth is established at an optimum depth of 100 meters. However, these pre-drilling target depths must be dynamically adjusted during active operations based on real-time evaluation of water inflows encountered by the drilling team.

Conclusions and Recommendations

From a geological perspective, the surveyed project area is characterized by dense Precambrian crystalline rocks, dominated primarily by Gneiss formations and complex migmatites. From a hydrogeological standpoint, the highly fractured and weathered zones embedded within these crystalline formations constitute excellent deeper aquifers capable of supplying a sustainable water volume for continuous domestic and public exploitation.

However, the technical expertise, mechanical methods, and drilling methodologies deployed by the chosen drilling contractor will play a critical role in determining the final yield and long-term productivity of the well. It is specifically recommended to strictly regulate and optimize the air compressor operating pressure during down-the-hole (DTH) hammer drilling operations. Maintaining optimal operating pressures is critical to prevent high-pressure air streams from forcing fine drilling cuttings into micro-fractures, which could otherwise obstruct the primary water-bearing fractures.

Consequently, all depth profiles stipulated in this engineering report serve as precise pre-drilling indicators. The Supervising Hydrogeologist and the Master Drilling Rig Technician must exercise on-site technical judgment to decide whether to stop or continue drilling based on real-time field realities (such as rig penetration rates, physical lithological chip analysis, and measured water inflows).

Finally, it is standard engineering practice to note that all indirect geophysical prospecting methods are inherently probabilistic in nature. The primary objective of advanced geophysical modeling is not to eliminate the risk of an unproductive well, but rather to minimize this risk to the lowest possible engineering threshold.


Table 2: Summary of Results from Soundings

Point ID

Sedimentary Horizon

GPS Coordinates (WGS84)

Min Depth

Max Depth

Engineering Prognosis

F1

0 – 16.00 m
(Overburden)

X: 5°56'0.67"N
Y: 10°10'38.60"E
Z: 1648 m

100 m

100 m

High Probability / Positive Borehole Target

 

Image Gallery

Request a geotechnical assessment for your project

Get A Quote

We will respond to your message as soon as possible.

GTE

You are just a phone aware from making your dreams a reality.

We respond almost immediately.